Project: Connect Plus , Overflow Ponds, Hungerford, Berkshire


Value: >£20K

Duration: 15 Days

Requirement:

Remove existing, dilapidated system and replace with new.

Solution:

Supplied and installed our individual netting systems to each of the ponds; included zip access as standard so that the client can either reach through or climb in to the protected area to carry out routine maintenance works.

Comments:

Our work is often not easy but our install teams love a challenge and their hard work and flexibility with this install meant that we completed on time and more importantly our client was very satisfied with the overall outcome.